Atchafalaya River Crewboat Cut/Bay/Bar – Dredge Robert White completed dredging on April 23rd.

Atchafalaya River Maintenance Dredging:  Bayous Chene, Boeuf and Black – Dredge Susan Crosby has been on site since January 8th.

Atchafalaya River Bar Channel – Contract awarded to BRICE Civil Constructors September, 2018, Dredge Arulaq has been on site since January 1, 2020 and operating satisfactory.  The contractor is in the “Acute Remediation Phase” and will continue dredging operations 24/7 until project depth is achieved at 1.2 maximum density throughout the fluid column.

Berwick Harbor -Both Stouts Pass and Berwick Bay Harbor are currently without major shoaling issues